CHENNAI: In a significant move towards a greener future, the Tamil Nadu Green Energy Corporation Limited (TNGECL) is planning to increase solar power generation and introduce Battery Energy Storage Systems (BESS) to meet its Renewable Purchase Obligation (RPO) by 2030.
TNGECL Managing Director Aneesh Sekhar told TNIE that Tamil Nadu currently has an installed solar power capacity of nearly 10,000 megawatts (MW).
“We have enough land to add about 12,000 MW more. However, even that will not be sufficient. Our target is to reach at least 50,000 MW of solar power capacity by 2030,” he said.