News

Shivrinarayan News: Ram Van Gaman Path Circuit project hangs in balance

Shivrinarayan. The work of Ram Van Gaman Circuit has been stalled in the city for the past several months. No work is being done on the welcome gate near the Nataraj Chowk of the city. People are finding it very difficult to commute through that road because a chahli has been made with iron rods for the welcome gate, which has been lying as it is for the past several months. The pedestrians passing by are also very upset with the incomplete work. The kiosks are lying under the open roof in the fair ground and all the kiosks are turning into junk.

Shivrinarayan. The state government had started the Ram Van Gaman Paripath Yojana to develop the places in the state through which Lord Rama passed. Shivrinarayan Nagar was also included in this scheme. In the first phase, work was done to beautify the entire temple complex including cafeteria, Ramayana Interpretation Center, Sulabh Toilet, Bawaghat and construction of Deep Jyoti Stambh in Lord Shivrinarayan temple premises, fall ceiling in the entrance, installation of red stones in the big temple complex and painting on the walls. Which was inaugurated by the Chief Minister on 10 April 2022 on the occasion of the inauguration of the state level Manas singing competition and Ram Van Gaman Paripath.

chhattisgarh news kiosks turning into junk, not allotted – 8 kiosks made of iron, tin and wood have been built by the Tourism Department to be allotted to people for installation near Chowpatty on the banks of Mahanadi. Which are lying in the fair ground since before 10 April. All the kiosks are rotting under the open roof, but till date they have not been allotted to the people.

River point being built on the banks of Mahanadi is also incomplete – The river view point being built on the banks of Mahanadi near Chowpatty is also incomplete. The statue of Lord Ram has been installed near Shabri Bridge, but the work of the grand entrance gate and beautification is incomplete. The work of the entrance gate being built near Natraj Chowk is incomplete.

Back to top button