Batauli. Ambikapur National Highway 43 has turned into a pond in the first rain itself. Due to this, the passengers are facing a lot of problems. At the same time, there is a possibility of this problem continuing throughout the rainy season. Let us tell you that the construction of the National Highway started in 2016 and now by 2023 the road has been built to a large extent. But the area of Luchki Ghat is still in a dilapidated condition. Accidents happen here every day. People are troubled because of the jam. After the media reports in the past days, the National Highway has done the work of asphalting in the winding turn of Luchki, which has brought relief for the time being.
It is difficult to say for how long relief will be available from temporary asphalting. Here, as soon as you leave Ambikapur, the area up to Luchki Ghat is full of water at this time. The construction of flyover is going on. Till this rainy season, movement from the flyover does not seem possible, but before that the old road through which the traffic continues has been completely submerged in water. There are deep potholes in this road. It becomes difficult in the rains. Whenever it rains, this road gets filled to the brim and the two wheeler including four wheeler riders have to make their way through those potholes. Many times accidents happen in this way. Even while taking sides, people lose balance and become victims of accidents. After late evening, jam starts here. This condition persists throughout the rain. If the concerned TBCL company or the National Highway still repairs this road, then the problems can be reduced in the rainy season.