Phase-3A Project: Bengaluru Metro Red Line from Hebbal to Sarjapur

Business Business: Bangalore Metro Rail Corporation Limited (BMRCL) has already submitted the DPR for the Namma Metro Phase 3A Red Line or Hebbal-Sarjapura line to the government. The state government has given the green signal, and now it will be sent to the central government for approval. This new route will pass through the heart of Bengaluru, making it a highly sought-after corridor. This route was announced by the BJP government in the 2022-2023 budget. A total of 28 stations will be built, including 4 interchange stations. Which stations will be included? Hebbal

Ganganagar
Veterinary College
Mekhri Circle
Palace Guttahalli
Golf Club
Basaveshwara Circle
KR Circle
Town Hall
Shanthinagar
NIMHANS
Dairy Circle
Kormangala 2nd Block
Kormangala 3rd Block
Jakkasandra
Agara
Ibbalur
Bellandur Gate
Kaikondrahalli
Doddakannalli
Carmelaram
Ambedkar Nagar
Kodathi Gate
Muthanallur
Dommasandra
Sompura
Kada Agrahara Road
Sarjapur
4 interchange stations
The Red Line will have 4 interchange stations:
Hebbal: Connects Red, Orange and Blue Lines
KR Circle: Connects Red and Purple Lines
Dairy Circle: Connects Pink and Red Lines
Agara: Connects Red and Blue Lines

Exit mobile version